Single Family Residential Housing
Excelize is working with a leading San Francisco based architecture
firm on a master planned community in Northern California. Excelize
has generated the complete Construction Document set for these single
family homes. The scope of work also involved design development.
(6 images)
Multi Family Residential Housing
Excelize team worked closely with a leading architecture firm in
Northern California on the design and development of a multi-family residential
community in Sacramento Valley. This project included design development for
6 courtyard buildings of 20,000 sq. ft. each and 3 town home buildings of
10,000 sq. ft. each. (6 images)
Ski Lodges in Montana
Excelize worked with an architecture firm that specializes in design build
ski lodges. Our team developed the construction document set and coordinated
and worked with structural engineers to generate structural documents.
(8 images)
TI work for retail franchise
Excelize has successfully worked on multiple retail franchise
store for a corporate group in Southern California and Arizona.
(2 images)
Retail Shells in Northern California
This project includes 40 retail buildings of various sizes. Excelize worked on
all the CAD drawings for the shell and TI work for clients. (1 image)
University Housing
Excelize team worked on a design review package for 300,000 sq. ft. university housing
complex for an architecture firm on the east coast of the United States. (2 images)
CAD Conversion
For this project, Excelize worked with a prestigious architecture firm in Southern California focused on school designs.
Excelize team converted existing hand drawn scans into AutoCAD drawings for six buildings in record time.
(4 images)
Historic Restoration
Excelize is currently working with a reputed architecture firm in Virginia on restoration for a church
build in early 1900’s. Excelize is working on the as-build drawings and remodel. (2 images)