Design Documentation
Managing the complexities
of a mega project can be a delicate juggling act
that requires each design element to speak the
same language. Excelize is the only firm that
specializes in systematizing the chaos with a
foolproof system called the "4 Cs of
Design Documentation"
- a set of
Coherent,
Complete,
Coordinated and
C onstruction-Ready documents.
This means that the drawings prepared by the architectural and engineering professionals, various consultants and facility providers concerned with a single project are standardized to introduce uniformity in nomenclature, units of measure, annotations, detailing and data presentation. This also establishes CAD production guidelines and parameters for the entire team of project consultants.
In addition, all drawings
and plans must adhere to the highest international
standards, especially in a day and age where
work-share is the norm. Excelize's extensive
experience with international clients as
work-share partners enables us to execute this
flawlessly.
Excelize
has executed more than 500 design documentation
projects with over 50 AEC firms in the US. We have
successfully executed a variety of projects at
every stage of drawings e.g. Schematic Design
(SD), Design Development (DD), and Construction
Documents (CD). The wide variety of projects we
have executed include hotels, resorts & spas,
corporate offices, mega malls, retail centers,
schools, universities, mixed use and multifamily,
single family villas and custom homes for clients
in the US.
|