At the heart of our benchmark business practices is a powerful suite of software tools that drive the DMS model. Our showpiece application is the Excelize Detail Manager (EDM), designed to catalog and centralize all your design components at a single location.
Mega projects have a way of challenging even the most robust process-driven systems. Now no more random searches through folders and files in your computer hard drive. EDM makes it easy to catalog, manage search, retrieve and reuse your entire library of AutoCAD drawings in a searchable database. The result - accurate, high-quality drawings available on time, every time.
Excelize's Building Information Modeling platform includes a portfolio of the latest Computer-Aided Design (CAD) tools including AutoCAD®, Revit®, ADT® and ArchiCAD®, 3D StudioMax® and Autodesk VizRender®.
To download the latest 30 Days Trial-version of Excelize Detail Manager, please click here.
|
Architectural
Stamping Utility |
|
As the size of the
projects over the globe increase where
hundreds of sheets are to be released for
construction, it has become a nightmare for
architects and consultants to sign on each drawing
sheet. It is also is a matter of great
confidentiality of the stamp to which any
architect or consultant would agree. Driven
by this need, Excelize has developed a
"Secured
Stamp Utility" for automating
process of printing the drawings along with
your stamp on it.
This software
utility enables you to maintain the
confidentiality of the stamp by allowing the use
of the stamp at the time of printing with a
secured log-in which is valid for a very short
period of time. The printing
team
will have ask for a
new log-in if they don't use it in the specified time limit, thereby also
streamlining the process of printing in the architect's or consultant's office.
|